Sample schedule for financing construction work. Financing schedule for the purchase of construction and finishing materials

This plan is a specific sequence of work stages and deadlines for their completion.

Such a plan is created as an addition to a document on the implementation of any type of work. This may apply to construction, mechanical engineering, etc.

The plan should be simple, beautifully designed, and understandable. But its main goal is to break the work into parts.

Man is designed in such a way that he better perceives what he sees. That's why we are always afraid of big work. To speed up the execution process, it is advisable to divide all the work into small parts.

The plan must indicate responsible persons, deadlines, number of man-hours, as well as detailed instructions and recommendations.

Example:

Such a work schedule should be drawn up based on these resources. Let's consider the situation using the example of the foreman of one of the construction companies. You need to improve an apartment with an area of ​​90 sq.m.

Do you have:

  • 10 people subordinated (human resources)
  • 7 kg. putties, 10 l. glue, 4 rolls of wallpaper ( material resources)
  • 6 days to complete the work (time)

Based on the available resources, you need to start building a plan. By the way, resources should be indicated in the plan. This is necessary if you are forced to postpone the due date.

And even if you break all the work into points, this does not guarantee the delivery of your project on time. The fact is that the person doing the work tends to get everything done at the last moment. For example, work for which a deadline of ten days is assigned is completed in the last two days before the end of the deadline.

Obviously, this approach will not provide the required quality. To control the performer, it is possible to introduce “control points”, i.e. additionally break down each plan item into sub-items.

During the execution of work, unforeseen difficulties may arise that can increase the delivery time (increased volume of work, reduced funding, etc.). To ensure that both parties do not have any complaints, all changes should be made in writing, and at the very beginning of the project. Agree, later it will be much more difficult to explain why oral contracts should be replaced with written ones.

The plan must necessarily include points that would regulate negotiations between the customer and the contractor. For example, a description of negotiating, communicating results, receiving comments, clarifying tasks, and correcting them. This is necessary because communication with the customer usually takes a lot of time during the project.

Below is a standard form and a sample work schedule, a version of which can be downloaded for free.

News

We carry out a full range of general construction and finishing works(monolith, finishing, screed, masonry, high-rise installation, metal structures and much more), as well as design and installation strip foundations, bored foundations, pile-grillage foundations, foundation monolithic slabs. Strengthening old foundations. Marking, excavation work, binding of reinforcement, production of formwork, etc.

We travel to districts and neighboring regions. Mobile, high quality, hardworking, energetic, fast, physically strong, without bad habits, with a great desire to work. Partially with our own tools, we understand drawings and projects, not intermediaries. Preferably low-rise houses, cottages, dachas, garages, household buildings, trade and retail buildings, outbuildings, fences, sheds and other work. We will consider and discuss all options, call any day of the week and any time of the day.

We will do it efficiently and on time. Prices are average. Call us and we’ll make an agreement.

Installation and replacement of heating, water supply and sewerage systems in private houses and apartments. Installation and replacement of water meters, washing machines, faucets, toilets and bathtubs. Installation and piping of floor and wall heating boilers. Installation of coarse and fine water filters, as well as filters for drinking.

High-quality, and above all professionally performed electrician services are a guarantee of your safety and comfort for many years!

The primary task before starting the installation of electrical wiring in the apartment will be to select a qualified specialist who will carry out the work at a high level.

Installation and replacement of the meter

Electrical wiring diagnostics and troubleshooting

Grilling walls for electrical wiring, laying (installation) of electrical wiring

Complete or partial replacement of electrical wiring

Installation, installation and replacement of sockets and switches

Installing a call with a button and wireless

Installation and connection of chandeliers, sconces, lamps, etc.

Connecting electrical panels, replacing and installing RCDs, AUTOMATICS

Connecting indoor and outdoor lighting

All work on dismantling electrical wiring, cables and electrical equipment

Consultations

Financing schedule for the purchase of construction and finishing materials

Appendix No.___ to contract No. ___

for repair and finishing work

from "____" ____________2015

Cheboksary “____” ____________2015

Amount and date of issue by the Customer Money for the purchase of materials.

Contractor's signature on receipt of funds

Customer's signature on disbursement of funds

Amount, number and date of reporting documentation

Remaining amount

Description sample construction financing schedule

Construction financing schedule - DefSmeta Construction work schedule. Work production schedule sample production schedule! Construction financing schedule Sample No. 1. The procedure for constructing a schedule for construction, financing, and supply of resources: Schedule for financing things in 2009 capital construction state Smeta Light - example of a report Financing schedule. After comparing the estimated construction duration. Financing schedule Construction financing schedule. Estimating program DefSmeta Light - example of a report Graph. Sample construction financing schedule. Combined work schedule and financing schedule. As a rule, the financing schedule for the work is stipulated in the Design Agreement. Sample report on family living conditions. Work schedule, construction and installation days calculator, calendar plan for repair work. The act of cutting fabric sample for budget. Services for coordinating construction financing schedules. Supply financing schedule By and large, it is the financing schedule. Estimating program DefSmeta Light - example of a report Graph. Ministry of Construction Financing schedule (example) General work log. Below is a standard form and a sample plan. State financing schedule for capital construction items. Sheet in MS Excel for creating and designing calendars. Construction (repair and construction) production schedule. Services for coordinating construction financing schedules. Recognize the construction financing schedule. Find a sample construction financing schedule instantly. Sample verification schedule for measuring instruments - 3qq39upugvqvr. What is a work schedule - is it planning the construction of an object? A work schedule in construction can be found quickly. Network, calendar schedule of work production. Download file - Construction financing schedule sample in Excel Spam. For which items is a materials delivery schedule created? Sample construction financing schedule. Before it is completely good and unimportant. Assistance from a lawyer in the case of compensation for damage to health and moral harm. Break-even analysis, in which prospects and financial charts should be studied. The customer never had a financing schedule. We bring to your attention a tutorial on working with simple ones. Find a sample along with the Financing Schedule. Construction schedule in excel. One of the most important documents, especially in construction, is the production schedule. A sample work schedule is needed to draw up. Linear work production schedule sample - norplala’s diary CONSTRUCTION FINANCING SCHEDULE.