Center for training executive technical documentation. Estimated and as-built documentation for banking support of developers. Conditions of study on madpo courses

    The practice of maintaining, processing and presenting ID during construction, reconstruction, overhaul, restoration in the face of changing legislation and inconsistency of norms.

    For specialists who are directly responsible for the maintenance of ID-engineers for construction / OKS, heads of technical and technical documentation, specialists of the departments for the preparation of technical documentation and documentary acceptance, site foremen.

    Program

    • Real examples and practical recommendations for the development of various regulatory documents for the execution, presentation and storage of executive documentation, including practical recommendations for the development of work lists hidden works and critical structures subject to inspection.
    • Mandatory requirements of Rostekhnadzor (RD-11-05-2007) and other rules for issuing a general work log. Features of maintaining special journals. Preparation of a package of acceptance documentation for putting the facility into operation. Unaccounted for in RD 11-05-2007 amendments to the Town Planning Code, which came into force on 07/01/2017.
    • Rostechnadzor's requirements for the procedure for issuing inspection certificates for concealed work performed "before" and "after" 03/06/2016, in accordance with the provisions of RD-11-02-2006 and Rostechnadzor Order No. 428 dated 10/26/2015.
    • Types, composition, procedure for registration, presentation and storage of executive documentation. Examples and possible consequences careless management of the ID.
  • Course leaders:

    Naumenko Irina Ivanovna

    a specialist with many years of practical experience in the structures of the customer and the general contractor, with versatile knowledge in the implementation of large-scale industrial and civil construction projects. Significant and diverse experience in control and supervision activities, including work in the design supervision group of the General Designer, creation from scratch and management of the construction control service (General Contractor, and later the State Customer), as well as participation in state control (supervision). Experience gained in positions of various levels (from foreman to chief engineer), applied knowledge in construction and related professions allow the lecturer to consider problematic issues from different angles.
  • Course Feedback

    Sviridova Olga Vladimirovna
    boss
    LLC "ARHPROEKT"

    All the questions that I had before the seminar were resolved during the course of the classes.

    Milishnikova Elena Valerievna
    engineer
    LLC "Kinef"

Course of Study

"Construction control and quality management in construction"

The course is designed for construction directors and their deputies, chief engineers, investors, developers, customers of the construction and investment process and all interested parties.

By attending this course, you will:

  • get acquainted with the legislation of the Russian Federation in the field of construction control and quality management in construction,
  • learn about as-built documentation and its purpose in providing an organizational and technological scheme in construction,
  • learn to avoid mistakes project documentation leading to financial losses at the construction stage,
  • discuss with the teacher the issues of practical organization of production control and contractual work,
  • get examples of judicial and arbitration practice,
  • learn about common mistakes when maintaining as-built documentation at the facility and the responsibility of managers and participants for quality and safety

Day 1 .

1. Organizational and legal the procedure for ensuring the quality of manufactured building materials, products, structures, completed construction objects.

  • « Technical Regulations on the Safety of Buildings and Structures” – Federal LawNo. 384-FZ of December 30, 2009 Introduction into practice of the list of National Standards and Codes of Practice.
  • Decree of the Government of the Russian Federation No. 1047-r dated June 21, 2010.
  • Requirements for the issuance of certificates of admission to types of work affecting the safety of facilities capital construction(Order of the Ministry of Regional Development of December 30, 2010 No. 624, Government Decree No. 207 of March 24, 2011).
  • Decree of the Government of the Russian Federation of June 21, 2010 No. 468 “On the procedure for conducting construction control”.
  • The Town Planning Code of the Russian Federation, taking into account the changes dated November 28, 2011 No. 337-FZ.
2. Regulatory framework for maintaining the executive, technical and technological documentation in construction.
  • Federal Law "On technical regulation» No. 184-FZ of December 15, 2010;
  • Guiding documents of Rostekhnadzor;
  • Requirements of regulatory and technical documents;
  • Requirements for project documentation;
  • National standards and codes of practice (Order of Rostekhregulirovanie dated June 1, 2010 No. 2079, Order of the Government of the Russian Federation dated June 21, 2010 No. 1047-r).
3. executive documentation and its purpose in providing an organizational and technological scheme in construction.
  • The composition and procedure for maintaining executive documentation during construction, reconstruction, overhaul capital construction projects.
  • New requirements for the maintenance of as-built documentation in accordance with Decree of the Government of the Russian Federation of June 21, 2010 No. 468 “On the procedure for conducting construction control”.
  • Mandatory requirements of the current SNiPs and SPs for the execution of as-built documentation in the implementation of construction control.
  • Experience in automation of as-built technical and technological documentation in construction.
4. Design documentation for the construction site.
  • Normative-legal and normative-technical support of design in the construction of facilities: a review of documents.
  • Composition of project documentation sections Composition of project documentation sections and basic requirements for their content (Decree of the Government of the Russian Federation No. 87 of February 16, 2008).
  • Review of errors in project documentation leading to financial losses at the construction stage.

Day 2

1. Production control.
  • Production control of building materials and construction installation work at all stages technological process. Input quality control of building materials.
  • Features of relationships with suppliers of building materials, products and structures in modern conditions.
  • Methods of quality control of construction and installation works, means of control.
  • Acceptance certain types work with the execution of the required documents.
  • Peculiarities of verification and execution of documentation during incoming quality control of incoming materials, products and structures in modern legal conditions.
  • Mechanical and physical methods quality control of materials and technological process in construction.
  • Technology of earthen pile and concrete works, quality assurance of construction.
  • Typical technological violations.
  • Features of operational quality control monolithic structures manufactured (erected) in the conditions of the construction site.
  • Update of GOSTs for concrete works (GOST-7473-2010 from 01/01/2012).
  • Control of welded joints (SNiP 03.01-87).
  • Devices and methods of non-destructive testing.
2. Contract work.
  • Types of contracts in construction and their features. The procedure for conducting contract work. Mistakes in the conduct of contract work. Termination of contracts due to violation of standards, regulations, technical conditions, etc. Judicial arbitration practice.
3. State control for quality in construction.
  • Changes in the system and structure of state supervisory authorities. Separation of powers between the bodies of Rostekhnadzor and Gosstroynadzor. Change in the status of the state building supervision. 8.
4. Errors in the maintenance of executive documentation at the facility.
5. Responsibilitymanagers and participants of the investment and construction process for quality and safety.
  • Updating articles 9.4 and 9.5 of the Code of Administrative Offenses of the Russian Federation. Changes to the Town Planning Code, strengthening the responsibility of construction participants for inadequate quality and safety (FZ No. 337 of November 28, 2011).
6. Answers to questions.
7. Issuance of documents.

((info-for-build))

Estimator courses - training budgeting in construction "from scratch", advanced training of novice surveyors in Moscow. Study of the software package Smeta.RU.

Course objective:

  • to teach competently to work with the current estimate and regulatory framework in construction;
  • give complex professional knowledge in the field of estimated pricing;

The result of training on estimated courses:

Knowledge:

Skill:

  • draw up all types of estimates and reporting and executive documentation in full compliance with applicable standards;
  • determine prices for resources and scope of work;

Program scope:

  • 72 academic hours (64 academic hours in person / 8 academic hours in absentia).

Employment prospects:

  • Graduates of training courses in budgeting of the training center are issued a qualification certificate ((tdoc)).

We do not claim that this best courses estimators in Moscow, the professional successes of our graduates and feedback from listeners speak for us!



Sign up for Estimator Courses in Moscow right now!

What is included in the accounting course

Estimator courses in Moscow include the study of pricing in construction, where everything starts with the usual definitions and ends with direct costs, capital investments etc. The course of budgeting training in Moscow is quite interesting, but it must be borne in mind that the training takes place in a fairly intensive mode, which, on the one hand, helps to keep attention, but also requires concentration. All course materials are provided to students in electronic format. Estimator courses in Moscow from scratch determine the cost of training services in different ways, but these prices do not differ much, therefore, when choosing an estimate business in construction in Moscow, focus primarily not on the cost, but on the detail of the training program and on the qualifications of the teacher, such information can be read on the website of the training center or ask the manager by phone. Courses are an estimated business in construction for beginners, these are, first of all, qualified teaching staff, an up-to-date training program and new software, it is these criteria that determine the guarantee of quality training for the estimator.

Course Curriculum

Topic No. 1 “Goals and means of budgeting. Investment process in construction”

  • goals and means of budgeting; participants in the investment process; contract price;
  • about the stages and stages of design;
  • assignment for design and initial data;
  • methodological documents in construction;
  • determination methods estimated cost construction.

Topic No. 2 "Estimated and regulatory framework in construction"

  • estimated rate;
  • unit rate (FER, TER);
  • estimated cost rates for the construction of temporary buildings and structures;
  • estimated norms and additional costs in production:
  • construction and installation works and in production;
  • repair and construction work in the winter.

Topic No. 3 “Economic foundations of budgeting. Determination of articles of estimated cost "

  • construction cost;
  • price levels;
  • estimated cost of construction;
  • cost of construction and installation works;
  • direct costs;
  • basic salary;
  • operation of machines and mechanisms;
  • material resources.

Topic No. 4 “Overhead costs, estimated profit, limited costs. Budgeting methods. The composition and content of the estimate documentation "

  • group of items of overhead costs;
  • costs recorded as overheads;
  • accounting costs as part of the estimated profit;
  • bases for accrual of overhead costs and estimated profit (FER);
  • bases for accrual of overhead costs and estimated profit (TSN);
  • transfer to the current level of HP and SP (FER);
  • transfer to the current level of HP and SP (TSN);
  • rounding procedure for NR and SP;
  • preparation of local budgets;
  • requirements for local estimates;
  • numbering of local estimates;
  • rounding and numbering local estimates(FER);
  • rounding and numbering in local estimates (TSN);
  • features of drawing up estimates for installation work;
  • feature of repair and construction works;
  • a variety of construction production, estimate documentation;
  • features of budgeting for commissioning;
  • requirements for object estimates;
  • summary estimate calculation of the cost of construction;
  • summary estimate calculation of capital repairs;
  • transport for the removal of soil and garbage;
  • limited costs;
  • return amounts;
  • hidden works;
  • resource method;
  • determination of the estimated cost of equipment;
  • work on estimates analogues;
  • design work (application of base price reference books).

Topic No. 5 "Estimated and regulatory bases in construction"

  • estimate and normative base of 2001;
  • base structure 2001. GESN, FER and TER;
  • compilation rules budget documentation using the base of 2001;
  • Moscow estimate and regulatory base;
  • structure of TSN-2001;
  • rules for compiling estimate documentation using;
  • TSN-2001 bases for Moscow.

Topic No. 6 "Definition of the scope of work"

The form of the lesson is a practical lesson.

  • Rules for calculating the amount of work;
  • Practical work "Calculation of the volume of work for the repair of the room."

Topic number 7 "Practical skills in drawing up local estimates"

  • manual version according to FER and TSN bases;
  • computer version according to the FER and TSN databases (Excel);
  • practical work "Estimate for construction work";
  • practical work "Estimate for repair work";
  • calculation of costs for the dismantling of structures and equipment;
  • calculation of direct costs, overhead costs;
  • estimated profit and winter appreciation for the TSN-2001 base.

Independent work.

The form of the lesson - independent work
Quantity of study time - 8 academic hours

Homework:

  • Determine the estimated cost and estimated cost of civil works.
  • Preparation of estimate documentation for the assignment in Excel.
  • Self-acquaintance with the types of executive documentation (KS-2, KS-3, KS-6, M-29).

Software complex "Smeta.RU"

Topic number 8. “Setting up the program. Estimate-normative reference system. Search system"

  • basic concepts normative bases;
  • program launch, main window, toolbars, information tool Manager;
  • menu: estimates, work, information, directories, settings, window, help;
  • work with program directories;
  • information tool Manager;
  • formation of bypass routes;
  • filling in the directory of organizations;
  • presentation of information in the estimate-normative reference system, viewing collections, viewing resources, ESN, general and technical. parts, scope of work, recalculation indices, types of resources;
  • how the search engine works;
  • verification of the project budget;
  • export and import.

Topic No. 9. "Creation of estimate documentation on the example of the regulatory framework of the National Security Council - 2001"

  • directory of objects, creating, renaming, deleting an object;
  • object parameters: settings, search paths, description;
  • creation of the budget structure, description of the structure element;
  • work with budget lines;
  • formation of a set of works; selection of unaccounted materials; input of scopes of works;
  • appointment of amendments;
  • formation of limited costs;
  • line numbering;
  • printing of the project estimate;
  • ways of presenting information in the project estimate.

Topic No. 10. "Working with the base TSN-2001"

  • presentation of TSN-2001 in the program;
  • program settings for working with the TSN-2001 database;
  • features of the formation of estimates using TSN-2001;
  • creation of KS-2 (percentages), setting the actual scope of work; adjustment of a set of works;
  • approval of the percentage, printing of the act of acceptance of work performed;
  • formation of a certificate KS-3;
  • formation of the journal KS-6;
  • formation of the M-29 form, printing of the M-29 form.

Topic No. 11. "Features of the formation of estimates using the norms of 2001."

Topic No. 12. "Formation of as-built documentation."

Topic No. 13. “Independent problem solving using the Smeta.RU software package”

  • creation of estimates using the resource method using the regulatory framework of GESN;
  • formation of estimates using the FER regulatory framework.
  • formation of estimates using the regulatory framework of the TEP of the Moscow region;
  • formation of resource calculation;
  • formation of a certificate KS-3;
  • formation of the journal KS-6;
  • formation of the executive estimate, printing of the executive estimate;
  • creation of M-29, formation of a list of write-offs of materials, printing of a sheet of write-offs of materials;
  • formation of the M-29 form. Printing of the M-29 form.

Teacher: an expert in construction control practices for more than 25 years, has experience in international construction projects for more than 10 years.

The program was developed taking into account the requirements of the Civil and Urban Planning Codes, the Code of Administrative Offenses of the Russian Federation, the Federal Law “On Technical Regulation”, the Federal Law “Technical Regulations on the Safety of Buildings and Structures”, Decree of the Government of the Russian Federation No. documents of Rostekhnadzor, other legislative, normative-legal and normative-technical documents.

Training program:

Module 1 Requirements Russian legislation to the maintenance of executive documentation in construction.

  1. Maintenance of as-built documentation within the framework of construction control as a mandatory form of assessment and confirmation of the compliance of buildings (structures) and construction and installation works.
  2. Goals and objectives of maintaining executive documentation.
  3. Construction participants are required to draw up executive documentation.
  4. Administrative liability for violations of the law in the conduct of executive documentation.

Module 2. Features of the organization of relationships in the "customer - contractor" system for maintaining as-built documentation in construction.

  1. Taking into account the requirements of the legislation when building relationships between the person carrying out the construction and the developer (technical customer) to organize the maintenance of as-built documentation.
  • the role of executive documentation in the delivery and acceptance of individual construction and installation works. The concept of "completed construction and installation work" in accordance with the law.
  • legal requirements for the commission survey of hidden works, critical structures, sections of engineering and technical support networks.
  • distribution of responsibility, rights and obligations of the parties to the contract for the maintenance of executive documentation.
  • executive documentation of the contractor and the customer. Documentation jointly drawn up by them.

2. Peculiarities of construction by the person carrying out the construction (general contractor), relations with persons involved on the basis of an agreement to perform certain types of work (subcontractors), on issues of maintaining executive documentation.

3. Features of building by the person carrying out the construction (general contractor), relations with architectural supervision on the issues of maintaining as-built documentation.

Module 3 Classification of executive documentation, its composition and content.

  1. Classification of as-built documentation by types: acts, magazines, protocols, as-built drawings and diagrams, etc.
  2. Classification of executive documentation according to the source of receipt or execution.
  • classification of executive documentation according to the source of receipt or execution.
  • legal requirements and normative documents to executive documentation provided by organizations providing services for testing, measurement, inspection, etc. (external documents of executive documentation). Checking its completeness and correctness.
  • requirements of legislation and regulatory documents for executive documentation drawn up by contractors ( internal documents as-built documentation: geodetic as-built documentation, as-built drawings, work logs, acts of incoming and operational control, etc.).
  • the requirements of legislation and regulatory documents for as-built documentation drawn up by construction participants during joint activities to construction control: general log of work, acts on the elimination of deficiencies in work, certificates of examination, acts of testing and acceptance engineering systems, acceptance certificates of the object, etc.

Module 4 Planning work on maintaining executive documentation.

  1. Legislative requirements for the planning of executive documentation.
  2. Planning of as-built documentation at the stage of drawing up a work contract and in the process of building an object.
  3. Criteria for the development of lists of hidden works, critical structures and sections of engineering and technical support networks for the subsequent organization of their commission survey.
  4. Criteria and examples for the development of blank documentation (acts, work logs, protocols, etc.)
  5. Organization of the movement of executive documentation (document flow). Appointment of persons responsible for maintaining various kinds executive documentation. Document management.

Module 5 Organization and implementation of measures for construction control and execution of as-built documentation by the contractors (general contractor and subcontractors).

  1. preparatory activities. Receipt by the general contractor from the developer (technical customer) and processing of initial information for planning measures for construction control and execution of as-built documentation.
  2. Development of organizational and technological documentation.
  • planning activities for construction control and execution of as-built documentation and their relationship with operational planning of work.
  • execution of control plans and lists of as-built documentation in work production projects (PPR).
  • the procedure for documenting the results of eliminating the identified shortcomings of the work indicated in the general journal and / or the author's supervision journal.
  • the procedure for carrying out measures for incoming control, execution of executive documentation based on their results.
  • order of conduct control measures on compliance with the rules for warehousing and storage of building materials and products used, execution of as-built documentation based on their results.
  • sequence and composition check procedure technological operations on the implementation of the construction of capital construction facilities (operational control), execution of as-built documentation based on their results.
  • examination of hidden works, critical structures and sections of engineering and technical support networks, execution of as-built documentation based on their results.
  • execution of as-built documentation in preparation for the implementation of measures for the delivery of the facility to the customer.

Module 6 Organization and implementation of measures for construction control and execution of as-built documentation by the specialists of the developer (technical customer).

  1. preparatory activities. Planning of control measures at the facility.
  2. The procedure for conducting a control measure and documenting its results at the facility.
  • familiarization with the organizational and technological documentation of the general contractor (as a person carrying out construction).
  • the procedure for checking the elimination by the general contractor of the shortcomings of the work, drawn up in writing in the general journal or the author's supervision journal, and drawing up an act on their elimination.
  • the procedure for checking the completeness and compliance deadlines performance by the general contractor of input control. Documenting its results.
  • the procedure for checking the implementation by the general contractor of control measures to comply with the rules for warehousing and storage of the products used. Documenting its results.
  • the procedure for checking the completeness and compliance with the established deadlines for the performance of operational control by the general contractor. Documenting its results.
  • examination of hidden works, critical structures and sections of engineering and technical support networks. Documenting its results.

3. Registration of as-built documentation in preparation for the final inspection by Gosstroynadzor.

The course provides a systematic summary practical advice for maintaining as-built documentation, "run-in" during the implementation of various construction projects which can significantly reduce production costs.

For whom is it intended

Managers and specialists of construction companies, developers (technical customers), contractors and general contractors, architectural supervision, state construction supervision, superintendents, site managers and all interested parties. As well as persons responsible for the operation of buildings and structures or regional operators.

Introduction

The program will cover issues taking into account current legislative and regulatory requirements.

You will receive a systematic set of practical recommendations for maintaining as-built documentation, “run-in” during the implementation of various construction projects.

This System can be considered as an element of anti-crisis management construction company, because allows you to significantly reduce production costs by reducing product defects, inconsistencies in document flow and theft at the construction site.

Program

  1. System of technical regulations in the field of construction. The procedure for the application and execution of regulatory requirements on a mandatory and voluntary basis during the implementation, acceptance and documentation of construction and installation works, finished structures and engineering networks and systems.
  2. The impact of the quality of executive documentation on the cost of construction; efficiency, profitability, reliability and durability of the operated capital construction object. Examples and possible consequences of not reliable as-built documentation.
  3. Algorithm of actions, a detailed consideration of the full range of measures to prepare for maintenance, as well as to organize the actual maintenance of high-quality as-built documentation in the regular mode, ensuring a significant minimization of labor, financial and time costs throughout the entire construction process.
  4. Types, composition, procedure for registration, presentation and storage of executive documentation.
  5. Practical recommendations for the development of working lists of hidden works and critical structures to be surveyed.
  6. Practical recommendations for the development of a Program for carrying out planned control measurements, testing of used building materials, finished structures in construction and laboratory conditions, as well as pipelines, engineering systems and equipment.
  7. Rostechnadzor requirements for the procedure for issuing certificates of survey of hidden works, critical structures and sections of engineering and technical support networks, completed "before" and "after" 03/06/2016, in accordance with the provisions of RD-11-02-2006 and the Order of Rostechnadzor dated 10/26/2015 city ​​No. 428.
  8. Practical recommendations for the design of executive geodetic schemes and drawings.
  9. Rules and features of the formation of a commission for the acceptance of hidden works, critical structures and sections of engineering and technical support networks, completed "before" and "after" 03/06/2016, and taking into account organizational structure construction industry and construction method. The procedure for vesting members of the commission with appropriate powers.
  10. Practical advice and real examples on the development of various regulatory documents for the execution, presentation and storage of executive documentation.
  11. Preparation of a package of acceptance documentation for checking the completed construction / reconstruction of the facility and putting it into operation.
  12. Intermediate acceptance of sections of engineering and technical support networks with subsequent documentation.
  13. Mandatory requirements of Rostekhnadzor (RD-11-05-2007) and other rules for issuing the General Journal of Work. Features of maintaining special journals ( concrete works, welding, installation work, etc.).

Participants are provided

Working materials, lunches, coffee breaks.

Document upon graduation

Based on the results of the training, students who have successfully passed the final certification for the training program receive a Certificate of advanced training in the amount of 72 hours (License for the right to conduct educational activities dated May 03, 2017 No. 038386, issued by the Moscow Department of Education).

Information for out-of-town clients

Nonresident clients are assisted in booking a hotel for the period of training.

This event can order in a corporate format(training of employees of one company).

Share