Orange Park - why you should take a closer look at it. Orange Park - why you should take a closer look at it Apartments - mostly without loggias and without extra square meters

Advertising

  • from 5.5 million rubles
  • Stakhanovskaya (opening in 2020)

Apartments from 5.5 million rubles, 100 meters from the metro. SEAD. Panoramic glazing. Weekly New Year's deals. Metro within walking distance (Nizhny Novgorod 15min, Stakhanovskaya opened in 2019, 5 minutes on foot). Ready infrastructure, occupied 2 stages. Underground and surface parking.

General information about the complex and the developer

Residential complex "Orange Park" is a comfort-class family building in the urban district of Kotelniki. The complex consists of 7 monolithic apartment buildings height from 17 to 33 floors, as well as its own infrastructure - 2 underground parking lots, a school and a clinic. In houses you can buy studios, one-room, two-room, three-room and four-room apartments with and without clean finish.

Features of LCD "Orange Park":

  • construction according to the PIK-standard concept;
  • all apartments are finished;
  • metro "kotelniki" 5 minutes walk.

In the small town of Kotelniki near Moscow, with the participation of the developer PIK, a new large microdistrict is being built. On the territory adjacent to the Kuzminsky Forest Park, monolithic skyscrapers with affordable apartments for young people and families with an average income grow one after another. Soon after them "pull up" social facilities– educational and medical institutions, parking lots for long-term storage of cars. During the construction process, the developer adheres to the author's PIK-standard concept, which is a general set of rules for a wide range of holding facilities. It helps to maintain the visual appeal of the project, while emphasizing manufacturability and landscaping. To what extent the level of the new building corresponds to generally accepted quality criteria, the "mystery shopper" found out.

Rating: 8/10, the new building belongs to the category of mass housing and is being built according to a typical PIK project - standard architecture, park yards and a number of social facilities; First of all, the project attracts with its close location to the metro.

Location: Moscow region, urban district Kotelniki

The new building is located in Kotelniki, a small town near the southeastern border of Moscow. The settlement is adjacent to Lyubertsy and Dzerzhinsky, to the west of it passes the Moscow Ring Road, which from residential areas separate the green spaces of the Kuzminsky forest park. The city has developed industry, well-developed shopping and entertainment infrastructure. Due to overcrowding, suffering social sphere- kindergartens, schools and hospitals are overcrowded, residents complain about the inefficient work of housing and communal services. The relatively affordable cost per square meter in Kotelniki contributes to the influx into the city foreign citizens. In other aspects, Kotelniki is a classic metropolitan satellite city with its own advantages and disadvantages.

The residential complex "Orange Park" is located in the northern part of the city between the forest park and Novoryazanskoe highway. The new building is being erected on the site of the Lyubertsy experimental field, where research was carried out in the field of Agriculture- the neighborhood now located there was named after her. Nearby there is a small pond and the shallow river Luberka flows.

Sales office at the construction site

At the facility at the address Moscow region, Kotelniki, md. Experimental field, ow. 10/2 there is a separate office building PIK Group, where you can get Additional information about LCD "Orange Park", choose and arrange the purchase of an apartment, consult with managers and mortgage specialists. Reception of visitors is carried out daily, from 09:00 to 21:00. The developer provides a free taxi service to the property, which is available on the official website of the new building.

How to get there by car and public transport

The new building is located less than a kilometer from the exit to Novoryazanskoye Highway. On it to the nearest interchange of the Moscow Ring Road a little more than 2 km - this is about 10 minutes of travel on a free road. But it should be borne in mind that traffic jams often form in Kotelniki in the mornings and evenings.

In 2015, a new metro station "Kotelniki" of the Tagansko-Krasnopresnenskaya line was opened in the city. The lobby is located 5 minutes walk from the new building. Public transport The district is also represented by buses and minibuses - 700 meters from the new building there is the Kotelniki bus station.

Rating: 9/10, for a project near Moscow, the new building has developed transport links - the metro and bus station are within walking distance, and the Moscow Ring Road is only 2 km away.

Construction progress: queues and deadlines for the delivery of buildings

The construction of the LCD "Orange Park" is carried out by a large metropolitan developer. This is a developer with more than 20 years of experience and an impressive portfolio - the holding's projects include at least 100 residential complexes, including "", a conceptual quarter ("Wander Park") and a new building near the water "". PIK owns dozens of autonomous companies, own production facilities, the developer is included in the list of backbone enterprises Russian economy working closely with government agencies.

The land is owned by official developer- to them in accordance with and with project declaration is OOO VOSTOCHNY. The company is part of PIK and is responsible for the construction of the complex. The master plan of the new building includes the construction of 7 multi-apartment residential buildings and several infrastructure facilities: in particular, 2 underground parking lots, a comprehensive school and a clinic.

At home

Completion of construction

Altitude

1st turn

17-33 floors

commissioned

2nd turn

III quarter 2019

3rd turn

IV quarter 2020

The developer divided the construction process into 3 stages. The first of them has already been implemented - in November 2018, blocks 1, 2 and 3 will be occupied. In the summer of 2019, 2 more houses should be put into operation. The last pair of buildings will be commissioned in the fourth quarter of 2020. After that, the developer will only have to complete the construction of social infrastructure facilities.

Rating: 8/10, the residential complex is partially implemented, and potential buyers have the opportunity to evaluate the real quality of the developer's work; in addition, PIK Group is one of the most reliable organizations on the market.

Construction technology. Architecture

For the construction of houses in the Orange Park residential complex, a monolithic technology is used, which has replaced the obsolete panel technology. Its main differences are high energy efficiency and reliability of the design. External and internal walls act as a support for panel buildings, while monolithic house rests on reinforced concrete structures. Enlarged windows with window sills 50 cm high will be installed in the buildings of the residential complex. Their manufacturer is a subsidiary of PIK, KBE products are taken as the basis.

About the PIK-standard concept

The recognizable architecture of all PIK new buildings is due to the author's concept, which the developer developed specifically to ensure that all of his new buildings correspond to a single style - both outside and inside. The provisions of the PIK standard make it mandatory for houses to have through entrance groups at ground level, increased glazing, park yards and their own infrastructure.

Architecture and landscaping

The exteriors of the new building differ from the traditional urban style for PIK. Instead of clinker bricks, the developer decided to use ventilated facades and partly plaster. The color scheme includes 3 shades - white, dark gray and bright orange, thanks to which the new building got its "citrus" name. Together with the minimalist facades, this coloring looks quite appropriate. When placing buildings on the site, they adhered to the European model - houses of different heights form mini-quarters with separate courtyards-parks.

Landscaping includes landscaping - planting trees, arranging a lawn and flower beds. Pedestrian paths will be built between the quarters, along which benches for rest, trash cans and small architectural forms will be installed. The project also includes the creation of children's and sports grounds.

Entrance groups and halls

In the new building, through entrance groups are organized with entrances at ground level. The interior space will be designed within the framework of the PIK-standard concept. The halls will have high ceilings of more than 4 m, stained-glass entrances, designer decoration in a modern style. There will be a dedicated area for strollers and bicycles.

Rating: 8/10 for the use of modern monolithic technology in construction and the original architecture of the complex, which differs from most PIK projects.

The choice of apartments: from studios to 4-room apartments, with or without finishing

In the new building, you can buy apartments ranging from 21 to 107 square meters. m. and ceilings 2.65-2.85 sq. m depending on availability. The main focus is on affordable housing - compact studios and "odnushki" Euro format. Young couples with and without children are offered larger apartments - the sizes of "kopeck pieces" and "three rubles" are 51-91 square meters. m. Large families of 5-6 people or more can accommodate up to 107 square meters. m.

Apartments in LCD "Orange Park":

  • studios;
  • 1-room;
  • 2-room;
  • 3-room;
  • 4-room.

On average, there are 9-15 apartments per floor - a lot, but, based on the size of the buildings, this was expected. So that the residents of the houses do not crowd on the sites waiting for a free elevator, 4 elevators will be installed in each section - all cargo-and-passenger.

Finishes and layouts

In almost every new building, you can find both apartments with finished decoration and open-plan housing. The only exceptions are buildings 6 and 7 - only “finishing” options are presented there. The repair was carried out in a turnkey format: the apartment was rough and finished, doors and windows, plumbing and air conditioning were installed.

There are 19 different planning solutions presented in the residential complex, not counting variations. Linear and swing apartments are available with a view to two cardinal directions, with separate and combined kitchens, standard glazed loggias. The layouts do not provide for separate dressing rooms, but in large apartments there are 2 bathrooms. The sizes of residential premises vary from 10 to 18 square meters. m.

Rating: 8/10, in the new building there is a choice of apartments with and without decoration, the layouts are classic, mostly of the European type.

Non-residential fund: commercial areas, storerooms, parking spaces

The first floors of the houses are reserved for street retail - supermarkets, pharmacies, banks, beauty salons and other retail facilities. Premises for business are equipped with a separate exit with display windows, inside - bare walls. Anyone can buy this property.

Individual pantries for underground floors houses can only be bought by apartment owners. But there will not be enough space for everyone - the calculation is only for every second tenant. Each pantry is fenced and locked during the absence of the owners, available areas - from 3 to 7 square meters. m.

Parking spaces: 2 underground parking lots, guest parking lots

On the underground floors of buildings 3 and 5, underground parks are organized with a total capacity of 719 parking spaces. In addition to them, residents will also have access to free open parking lots next to their houses.

Rating: 8/10, presented in a new building a full range of non-residential property- Parking spaces, storerooms and commercial premises.

Infrastructure and ecology: a densely populated area, near a forest park

In Kotelniki, there is a shortage of places in social institutions - kindergartens, schools and clinics. In this regard, many residents are forced to turn to private and Moscow organizations, which is inconvenient and associated with a loss of time and money. The problem has been heard for several years, and the developer prudently included the construction of his own social facilities in the project.

Internal infrastructure of LCD "Orange Park":

  • general education school (for 2,100 places);
  • built-in polyclinic (for 100 visits per shift);
  • 2 underground parking lots (719 cars).

A polyclinic for children and adults will be built in an annex between buildings 6 and 7, the estimated commissioning date is the first quarter of 2021. The laying of the foundation of the future school will begin in 2019, it should open its doors to the first students in 2021.

There is no shortage of trade and service establishments in Kotelniki. Not far from the residential complex there is a Castorama hypermarket, in the surrounding quarters there are various shops, banks, medical offices and pharmacies, beauty salons, catering establishments. If you drive a couple of stops on the bus, you can visit the picturesque outlet " Belaya Dacha”, built in the format of an old European town.

The shopping and entertainment center in Kotelniki is the Mega Belaya Dacha complex. It is located 2 km from the new building at the Novoegoryevskaya interchange of the Moscow Ring Road. This is the second largest trading floor in Europe, where there are more than 280 stores, an IMAX cinema, numerous cafes and restaurants, a conceptual theater at its best. On the other side of the highway there is also a large covered market "Gardener".

Another iconic place next to the residential complex is the Belaya Dacha (Dacha Arshenevsky) estate, which consists of a house built in 1788 and a park surrounding it with a large reservoir and a functioning church of the Holy Martyr Victor the Warrior. On the territory of the estate there is a museum of greenhouse vegetable growing. The park area is partially open for walking.

In neighboring Dzerzhinsky, there is a complex of Lyubertsy sand pits. There are three of them - Big, small and Dzerzhinsky. Once sand was mined in these places, and now they are open for recreation. On the banks of the Big Quarry, a large beach opens every summer, and a large ski complex operates all year round.

Ecological situation

Many commercial facilities are located in Kotelniki, but manufacturing enterprises are concentrated closer to Dzerzhinsky and Lyubertsy. 1.5 km from the new building there are only the Pervomaisky cold storage facility, a textile factory for the manufacture of carpets and the Stalkon production and construction company.


In the area of ​​Kotelnikov there are 2 large recreational zones at once - Tomilinsky and Kuzminsky forest parks. The latter is a forest area of ​​1,189 hectares - these "green lungs" help to significantly improve ecological situation in the city.

Rating: 8/10, despite the lack of social facilities, the area of ​​the new building can offer a developed commercial and recreational infrastructure.

Conditions for the purchase of apartments: equity participation agreement (DDU), sale and purchase agreement, mortgage

The developer himself is engaged in the sale of apartments in a residential complex. Sale is possible both under DDU (214-FZ), and under a sale and purchase agreement in ready-made buildings. Can be paid from own funds, if necessary, you can use one of the mortgage offers. Major companies cooperate with PIK Russian banks who are ready to provide a loan for a period of 1 to 30 years. For certain categories citizens (young families, military, holders of certificates maternity capital etc.) there are special programs.

Summary: the pros and cons of a new building

Residential microdistrict "Orange Park" is a vivid example of a good new building, focused on the mass buyer. In terms of its level, the project can claim to be a comfort class - the new building looks modern, the choice of apartments is quite extensive, along with the houses they are building their own infrastructure. The main advantage of the residential complex is its location next to the only metro station in the city.

pros:

Metro within walking distance;
- apartments with or without finishing to choose from;
- near the forest park "Kuzminki".

Minuses:

Tense situation with social infrastructure;
- traffic jams at the exit from the Moscow Ring Road;
- Insufficient parking spaces.

Neighborhood with two large forest parks and a minimum number of local manufacturing enterprises allow assessing the level of local ecology in a positive way. Apartments in the residential complex "Orange Park" will definitely find their buyer. The lack of social infrastructure is fixable, but finding housing in the Moscow Region near the metro and the Moscow Ring Road is becoming more and more difficult every year. As a result, the residential quarter receives a solid 8 points out of 10.

Overall rating for LCD: 8/10

The Orange Park residential complex is being implemented by the PIK Group of Companies in the Experimental Field microdistrict of the city of Kotelniki. The new building includes:

  • 10 houses of variable height - from 17 to 33 floors;
  • polyclinic for 100 visits per shift;
  • three private built-in kindergartens for 82 places each;
  • municipal kindergarten for 350 places;
  • school for 1500 students.

Construction is carried out according to monolithic technology.

Apartments

Buyers offered 19 various options layouts. The area of ​​housing is presented in the range from 25 to 70 square meters. m, the ceilings reach a height of 2.8 m. There are apartments with one, two or three rooms, as well as studio type.

Enlarged windows are installed in each room, horizontal wiring of the heating system is carried out, heat meters are installed. The cost of housing includes the installation of an air conditioner with Wi-Fi control and a 5-year warranty. The interior decoration of the apartments is not provided for by the project in all houses.

Infrastructure

The entrance to the entrances is organized at ground level, which will ensure easy movement with a stroller or a bicycle. Each section has high-speed elevator descending into Underground Parking. The parking lot will be under 24-hour video surveillance, and spaces for cars and SUVs will be provided.

LCD "Orange Park" is located near the metro station "Kotelniki". There are several shopping centers in the microdistrict, Mega hypermarkets with a cinema, Belaya Dacha and Ikea. There are 3 schools, 7 kindergartens, several fitness centers, and the Druzhba sports complex in Kotelniki. The ecological situation is favorable. Nearby is a small reservoir, a little further Kuzminsky forest park. From the Moscow Ring Road, the new building is separated by 3.5 km along the Novoryazanskoe highway.

The monolithic residential complex is located two minutes walk from the Kotelniki metro station. The proximity to the Kuzminsky forest park and a large pond will allow you to enjoy nature every day. The complex will be separated from Novoryazanskoye Highway by a modern shopping and entertainment center with shops, cinemas and restaurants. Under the courtyards there are underground parking lots with direct lift access.

Environment and transport accessibility

Kotelniki is a well-maintained area with a developed infrastructure. There are three secondary schools and seven kindergartens, the largest hypermarkets: Mega Belaya Dacha, Kastorama, Auchan, Ikea, etc., the Druzhba sports complex and the MassFitness club, beauty salons, pharmacies, bank branches, medical clinics.

The nearest metro station is Kotelniki. The Moscow Ring Road is 3.5 kilometers away. It is necessary to follow the Novoryazanskoe highway.

Conditions for the purchase of apartments

Apartments are sold in accordance with Federal Law No. 214. The apartment can be purchased not only under the condition of a one-time payment, but also in installments and mortgages. PIK Group of Companies provides interest-free installment plan with down payment 50%.

Updated: 02/10/2020

Font size

What you need to know about LCD "Orange Park"

EVERYTHING IS FOR, AND BABA YAGA IS AGAINST

As it turned out not so long ago, in the city of Kotelniki there were enough free plots of land suitable for the construction of residential complexes on them. The explanation for the sudden activity of a number of well-known development companies lies on the surface: Kotelniki can be attributed to the Moscow Region only according to the existing administrative-territorial division, in fact, this is the same Moscow as Zhulebino, located nearby, only more “breathing” than Moscow inside the Moscow Ring Road . LCD "Orange Park" is being built in the Experimental Field microdistrict of the city of Kotelniki, a couple of kilometers from the ring road, 150-200 meters from the fresh Moscow Metro station "Kotelniki":

and at an even shorter distance to the Kuzminsky forest park. The location of the Complex looks advantageous, but not for those people who ALREADY LIVE in Kotelniki. Hence the reasons for the constant whining and trolling in in social networks and on forums dedicated to New Buildings in general and LCD "Orange Park", in particular. Yes, we agree, there are not as many schools in Kotelniki as we would like - so buyers of apartments should take care of where to place their children in advance. Kindergartens? Here the situation is a little better.


But the rest of the horror stories ... Well, where, pray tell, Kapotnya with a hint of an unbearable stench in Kotelniki? And the stories about the fact that illegal Central Asians from the Sadovod market will buy up apartments here and "you will have a pleasant neighborhood." Does Sadovod give salaries that allow you to buy the same studio for 4,000,000 rubles? Let's try to look at the LCD soberly, without the initial negative pumping.

WHAT WHERE WHEN

The building address of the Complex is the Moscow Region, the city of Kotelniki, md. Experimental field, ow. 10/2. Owner land plot, and therefore the Developer of the residential complex is RegionInvest LLC, which is part of the General Contractor - BOES Construction. On the page of the PIK official website dedicated to the Orange Park residential complex, you can see the silhouette of the future shopping center, which, in addition to its traditional purpose, serves as a kind of shield between the Complex and Novoryazanskoye Highway. Construction takes place in three stages.


Stage one:

room 1: (Sosnovaya st., 1k1) 30-storey tower, 348 apartments without finishing, 45 storerooms, RVE received on 12/29/2017.
room 2: (Sosnovaya st., 1k2) 5 sections, 17-30 floors, 1,006 apartments without finishing, 173 cars in the underground parking, 205 storerooms, RVE received on 12/29/2017.


Stage two:

room 3: (Sosnovaya st., 1k3) 5 sections, 17-30 floors, 905 apartments (in the first section with finishing), 182 m / m in the underground parking, 196 storerooms, RVE received on 09/21/2018.


Stage three:

room 4: (Sosnovaya st., 1k4) 30-storey tower, 348 apartments with finishing, 45 storerooms, RVE received on 09/30/2019
room 5: (Sosnovaya st., 1k5) 5 sections, 17-30 floors, 844 apartments (in the second section with finishing), 179 m / m in the underground parking, 207 storerooms, RVE received on 09/30/2019


Stage four:

room 6: 33-storey tower, 510 apartments with finishing and room 7: 33-storey tower, 510 finished apartments, with a total underground parking for 395 cars and 135 storage rooms, commissioning is scheduled for - Q4 2020.

Stage five:

room 8: 33-storey tower, 496 finished apartments, room 9: 33-storey tower, 496 apartments with finishing and room 10: 33-storey tower, 505 finished apartments with a common underground parking for 804 cars and 190 storage rooms, commissioning is scheduled for - Q2 2022. In June 2019, sales of apartments in Buildings 8, 9 and 10 began.

We note the moment that, thanks to the non-standard shape of the square, where the 30-storey sections are displaced relative to each other, the insolation of the apartments will be provided properly. Tentatively, in the IV quarter of 2019, the construction of a municipal school for 1,100 students, a kindergarten for 170 kids will begin here. The construction of the polyclinic is planned to begin in the 1st quarter of 2021. In addition, PIK has planned the appearance of three private kindergartens on the first floors. The first private kindergarten Gornitsa-Uzornitsa, for 80 children, has already been opened. Thus, a number of infrastructure gaps in the district, which were mentioned above, will be closed.

THE RETURN OF THE LODGIA

At the time of the announcement of their other new building, which, by the way, is located 25 minutes away from here, PIK marketers, describing the facade, talked about the idea of ​​leaving “from the usual image high-rise building with an intrusive vertical pattern of loggias. They left in vain and, apparently, did not come to their senses for a long time - in this Complex ALL apartments have balconies, and at the same time, places for installing external air conditioning units on them.


Well, it was decided to make the facade in this case correctly and without unnecessary compromises, it is ventilated, lined with ceramic and fiber cement boards.


LAYOUTS

Among the 37-38-meter one-room apartments you can choose classic solutions with a small kitchen or choose options in which the kitchen can play the role of a dining room. In large 45-meter odnushki, the same kitchen will be at the same time a living room:


Square linear and angular two-room apartments testifies to their belonging to the economy class of housing, 70-meter swing kopeck pieces are presented here in very limited quantities:


corner three-room apartments area from 71 to 77 sq. m are endowed with the same layouts. The same principle is followed planning solutions large swing 85-90-meter treshkas. Luxurious four-room apartments relied only on some sections of multi-entrance buildings:


The apartments will be purchased under the DDU on the basis of FZ-214.


Mortgages are available in banks:

BEHIND
  • PIK is PIK
  • subway next door
  • interesting project
  • a large selection of apartments
AGAINST
  • a negligible number of places in underground parking
SUMMARY

In the construction of the Complex, PIK used more expensive solutions even compared to some of its Moscow new buildings, while apartment prices turned out to be predictably lower than within the Moscow Ring Road. Of course, there is a choice when buying housing in new buildings in Kotelniki - they have been actively building here in recent years, and the option with an apartment in this Complex is far from the only one. Nevertheless, it is definitely worth considering - in the end, everything promises to turn out very well.

I don’t understand why buy in the region if prices are the same in Moscow? Take Maryino - PSN is building there, odnushka 3 million 200 thousand, in Mitino there are inexpensive options. And sales there on DDU, but it’s scary to take on housing cooperatives

LCD Orange Park is located on the leeward side of the refinery in Kapotnya, but the wind from the refinery blows all the time just to Maryino and Bratislavskaya. So the topic of "dead squirrels" in the Kuzminsky forest park is not relevant - these are all the intrigues of competitors. And the number of "foreigners" has already exceeded 50% of the Slavs in the MSK and in the near Moscow region - I'm not talking about native Muscovites, who are getting smaller every year ...

From my windows you can see the entrance to the metro, and in reality it’s 50-70 meters from the house, BUT it wasn’t there .. You won’t go directly to the metro .. around the clay potholes, and in the rain it’s generally an “edge”. By car, it's generally 3_4 km to get to Novoryazanskoe highway. only the detour is the shortest way through the shopping center "Kostroma", "Real", BUT new barriers are already being installed at the entrances and exits, so the passage through the shopping center will be paid for PIK new settlers (apparently PIK and the heads of the shopping center have some kind of agreement ..: (() And all because the direct (old) PIK road was closed for repairs. They promised that it was only for 2 weeks, but it's all blah blah .. no road construction work is being carried out (I watch this from my windows every day) and so good .. the main thing is to sell the apartments .. and at least the grass doesn’t grow there .. so the presence near the metro station still doesn’t mean anything good. Now about the HOA _ this is a separate song .. it’s not clear who imposed them on us .. all these completely incompetent reminiscent manicurists of not the highest qualification, May, Albin and Krestin .. They have our money, but at the same time they do not bear any responsibility for anything .. except for tea and coffee drinking. cameras, not in the entrances, not in the parking lot.Only for security, each apartment pays monthly 670 rubles. only it’s not clear why .. the guards are not able to track on the displays what and where is happening because the 21st century is in the yard for a minute .. and the guards have nothing but a chair in the entrance and they periodically take it away .. At 1.45 in the night we went down to to the security guard to report that in the neighboring apartment are still being repair work(knocking, and noise from a puncher), while pointing to the ad that hangs above it, which informs residents of the schedule for repair work until 21h. weekdays until 22:00 on weekends. , to which he answered us: "What can I do.? Call the police ..". I'm not talking about the fact that the house resembles a marijuana-smoked Tajik hostel. From time to time, your door is trying to pull out with "what kind of gastorbeiter with meat, and to the question _ what do you need here, each of them answers:" nothing, I was just looking for my brother or matchmaker or friend .. to which our child already explains to them that the door has a bell button. I’ll sum it up .. we’ll shoot back from the guest workers, we’ll stand to the last bullet :), but that’s what the road was promised, but no one seems to be going to do anything .. sad .. :((where is the promised improvement.? apartments we were sold and now we are not interested in PIK .. honest business in our country is not in honor: (so that the admins do not delete my comments .. just in case .. I made screenshots and sent them to my friends bloggers.
Yes, and even when taking sq. and when you receive the keys, it suddenly turns out that your apartment is larger than it was originally supposed. You will be forced to pay supposedly a few extra square meters, we had to pay another 178 thousand (which was not included in our plans) .. although we invited independent expert licensed by the company. Which determined during the measurement of special. appliances, which is actually our apt. less than indicated in the technical plan. But the manager of PIK, who was assigned to us, recommended not to persist and not sue, since this case, you understand, is protracted and expensive, "it's better to quietly pay what you have been assigned there." And those shortcomings that were listed in the acceptance certificate have not been eliminated for 4 months already (although PIK has 45 days for this).

Somehow you described everything so terribly that I want to ask "how do you live there ??")))

Found an apartment. Yesterday my wife and I looked at the PIK website in detail, read your reviews. I want to feedback Anyway, that's why we're posting here. We were attracted in the first place that it was not in a bearish corner. Near the metro - you can walk on foot (which is not in Belaya Dacha or Novye Kotelniki residential complex). Before that, he lived in Moscow on Sadovoye, but now, due to his age, he is tired and wants peace, and when his grandchildren grow up, they will come to a calm and quiet place. In addition, there will be a very beautiful playground, and there is a park and a pond nearby. There is where to walk in the evening, right next to the house. And a huge plus that there are pantries. So many things have accumulated over our lives with my wife that they don’t even fit into the garage. By the way, we do not need it, fortunately, there is an underground parking. It seems that we understood everything correctly and are already at a low start.

I look at the reviews here right now, it became almost a year later
those who settled do not know the Russian language, nama prostonama
shtyshtypyrysh tysh shtaki shorter
Amen

Gotta take it!

There are schools, but local Russians, by hook or by crook, arrange them in Zhulebino or somewhere else in Moscow. Everything in Kotelniki recent years in the first classes, not a single Russian surname.

PLEASE CONSULT ON WALLS AND SCREEDS IN THE APARTMENT WITHOUT FINISHING. IN WORDS THERE WAS A FREE LAYOUT APARTMENT. AND AS A RESULT, WHEN SIGNING THE ACCEPTANCE ACT, THE TRANSFER IS ALREADY "THROULED" INTO ONE BRICK WALLS. OPINIONS ARE DIVIDED: SOME BELIEVE THAT WE WERE SIMPLY SCAM, THEREFORE, THE CONTRACT WAS SIGNED IMMEDIATELY AND STYAZhKE), OTHERS THAT THIS IS THE REGULATION OF DOCUMENTATION.WAITING FOR COMMENTS. THANK YOU.

Like the norm. It would be a swindle if instead of bricks they stuck a monolithic wall to you) Legally, there is no concept of a free layout, except perhaps in non-residential premises, apartments. That is, you are being sold an apartment with walls already thrown into one brick, it's like a project. If you build a wall on them, you won't have to go anywhere. The rest will be redevelopment, which you will need to legitimize. And developers have a free layout, which means that there are no load-bearing walls inside the apartment.

Good afternoon! I am now looking for an inexpensive version of an apartment, somewhere near the metro, I want to already live in my apartment, I planned to take it finished and not at an expensive price. I took a closer look at the Kotelniki metro station where several residential complexes are being built. The White Dews have already handed over their project, and prices there have already jumped, so this option is not for me, especially since I really did not like the location of the houses - windows to windows. Nearby, another residential complex is being built - boiler towers, which has been postponed since 2016. I don’t want to get involved with a long-term construction, so I dismissed the option with him too. But I liked Orange Park. It is much closer to the metro than Kotelniki and away from the MKAD highway, unlike Belye Ros. Orange is being built next to the park, not far from the Shopping Center and a minute walk from the subway. Good layouts of apartments can be bought already finished, and while the house is being built, the price is naturally lower. In general, in my opinion the most adequate option in the area and at a nice price.

Share